Archway

Archway:

The design should remind of the old Andalusian construction method of the old Finca. Because the holiday's arrangement is a Jogahotel, it was to be united to me importantly also a breath Asian architecture with. Roofing tiles are sketched in the Andalusian handle, but the roof inclination is Asian. The rounded forms unite Feng Shui by Andalusia.

Construction:

The columns are poured from concrete and are connected in the earth with a foundation. afterwards were dressed up they with break tiles. Edges are rounded. “The hard” starts to become soft.
The head part is built in the lightweight construction procedure. That is it can be removed with an oversized transport to the Finca, with the help of an autocrane.
The scaffolding of the head is an extravagantly made steel construction.

The ground was poured out with concrete to cause no damage to the object with the transport or by later decrease. At the same time it hardens the construction.

Afterwards 2 layers polystyrene foam plates were appropriated. This gets optical volume the object. These are plastered  with cement or synthetic resin.

It was to be generated to me importantly a different inclination of the roof. The uppermost line should be steadily bent. I wanted to provide the frontline at the uppermost end with a compressed bend. This creates the clearance for the decorative wooden boards. Though one does not take the different curves was aware, however, an interesting unaware tension gets the viewer. To generate this effect I welded of middle guide rails on the Oberkannte. On it I could hang up the roof records and plastering. At two places the roof was left open to be able to transport the construction later with the help of a steel rope.

Now I could construct the writing, cut out from tiles and stick.
 Afterwards everything was plastered again with a fine plaster. Now the object is almost ready. There is still no last decorative woodwork and painting .

The symbols of the wooden boards:
The sun should welcome the guests with the entrance in the arrangement which compass wish a good trip with the exit

By the evacuation I cuted the auxiliary props away. Mounting is one of the exciting moments. Do tune all mass? But everything ran once more perfectly. The last repairs of the transport, roofing tile of the holes are still to be closed .

[Furnitures design]
[Rustikal]
[Carved]
[Metal]
[Restauration]
[Sketches]
[Head sculptur mould]
[Restaurant "3 caravelas"]
[Restaurant "Oasis"]
[Biostore]
[Creative office]
[Archway]
[home] [Projects] [Sculptures] [copper pictures] [orders] [the artist] [contact,links]